Maintenance of Electrical Vehicle Charging

Suppliers are able to undertake all the services for planned preventative maintenance and reactive maintenance works for the complete project. This includes all required:

  • Testing
  • Commissioning
  • Maintenance repair
  • Maintenance replacement of the EVC point and associated equipment.

All successful suppliers are registered on the ‘Electric Vehicle Home Charge Scheme authorised installers’ by the ‘Office for Zero Emission Vehicles’.

All Decarbonisation frameworks
EV Charging 1020 x 660

Our suppliers

Flexible Direct Award Arrow Pattern

Direct Award

Customers are able to Direct Award to the top ranked supplier on this Lot providing that your requirement is within the scope of the framework. In exceptional cases, you are able to direct award outside of number 1 with a strong justification. If you’d like to speak to us about this in more detail please get in touch.

How long will this take me?

A direct award will take approximately 3-4 weeks depending on your internal approval processes.

Direct Award Process Guide
Flexible Direct Award Pattern one

Mini-Competition

You’re also able to run a mini-competition to call off this framework. You’ll be able to use your own specification and cost model. You can also choose your own cost / quality split and quality questions. All pricing submitted by contractors must be linked to the framework.

How long will this take me?

Once you have your specification and cost model ready, the tender process takes approximately 6-8 weeks, depending on your internal approval processes.

Mini-Competition Process Guide
IMG Flexible Direct Award 2025 05 27 145348 jbcp access-pattern

Accessing this Framework

Who can access this framework?

Any publicly funded body can use this framework – access is not limited to SEC Members alone. Full details can be found here.

Is there a cost to access? 

There is no access fee to use this framework. A levy % dependant on whether you are a guest or member is collected directly from the contractor once a call off contract is awarded. This percentage will never be more than 1.5% for Members and 2% for Guests.

How do I access this framework?

If your organisation is already a SEC Member then you will not need to sign an additional Access Agreement. You’re already signed up.

If your organisation is new to SEC, and would like to use our frameworks as a non-member then you will need to sign our Access Agreement. You’ll only need to sign this once and you’ll receive access to all our Frameworks and DPS’s – even ones we procure in the future. You can view a draft agreement here – DRAFT Access Agreement (Non-Members).

Framework Tender

We procured this framework through a two-stage restricted process. At the first stage interested suppliers completed a Selection Questionnaire (SQ). From there we then invited select tenderers to complete a second stage Invitation to Tender (ITT).

The cost and quality elements of each tender was evaluated at 30% cost and 70% quality.

Costs were based on RIBA stage and split into two sections:

  • Survey, Assessment, Design & Tender
  • Installation, Commissioning & Handover


Prices were provided for houses in bands of number of houses and then by £ per charging point. Prices were also provided for Communal Smart Charging points for flats. This Lot also includes pricing for funding advice for EV charging points.

Quality was assessed on:

  • Approach to carrying out surveys, assessment and programming the installation process
  • How the quality and effectiveness of the installation achieves long term low and zero carbon performance
  • Complying with existing, new and emerging zero carbon regulations
Framework cta

Next Steps

We've got two options depending on where you are with your project. 

Enquire about this framework

Target Start Date
Documents Ready
Document Support
Mailing Consent 
Terms Engagement