Membership

Main menu

About us

Main menu

Frameworks

Electronic payment services

Main menu

Training & events

Main menu

News & insights

Framework

Battery Storage

This Lot covers the design and installation of battery storage systems.

Suppliers can deliver: 

  • Battery storage design – including RIBA survey, assessment and design
  • Battery storage installation – including installation, commissioning, handover and monitoring
  • Battery storage services funding advice

Suppliers on this Lot are MCS certified and meet product standards – IEC 62933-5-2 and IEC 62619.

All Decarbonisation frameworks
Battery Storage 1020 x 660 1

Our suppliers

Flexible Direct Award Arrow Pattern

Direct Award

Customers are able to Direct Award to the top ranked supplier on this Lot providing that your requirement is within the scope of the framework. In exceptional cases, you are able to direct award outside of number 1 with a strong justification. If you’d like to speak to us about this in more detail please get in touch.

How long will this take me?

A direct award will take approximately 3-4 weeks depending on your internal approval processes.

Direct Award Process Map
IMG Flexible Direct Award 2025 05 27 145348 jbcp access-pattern

Accessing this Framework

Who can access this framework?

Any publicly funded body can use this framework – access is not limited to SEC Members alone. Full details can be found here.

Is there a cost to access? 

There is no access fee to use this framework. A levy % dependant on whether you are a guest or member is collected directly from the contractor once a call off contract is awarded. This percentage will never be more than 1.5% for Members and 2% for Guests.

How do I access this framework?

If your organisation is already a SEC Member then you will not need to sign an additional Access Agreement. You’re already signed up.

If your organisation is new to SEC, and would like to use our frameworks as a non-member then you will need to sign our Access Agreement. You’ll only need to sign this once and you’ll receive access to all our Frameworks and DPS’s – even ones we procure in the future. You can view a draft agreement here – DRAFT Access Agreement (Non-Members).

Framework Tender

We procured this framework through a two-stage restricted process. At the first stage interested suppliers completed a Selection Questionnaire (SQ). From there we then invited select tenderers to complete a second stage Invitation to Tender (ITT).

The cost and quality elements of each tender was evaluated at 30% cost and 70% quality. More detail on this can be found below.

Costs were based on RIBA stage and split into two sections:
• Survey, Assessment, Design & Tender
• Installation, Commissioning & Handover


Prices were provided in bands of number of houses and then by battery storage for:
• Battery & Invertor Lithium-ion AC
• Battery Lithium-ion DC


This Lot also includes pricing for funding advice both pre and post planning.

Quality was assessed on:

  • Approach to carrying out surveys, assessment and programming the installation process
  • How the quality and effectiveness of the installation achieves long term low and zero carbon performance
  • Complying with existing, new and emerging zero carbon regulations
     
Framework cta

Next Steps

We've got two options depending on where you are with your project. 

Enquire about this framework

Target Start Date
Documents Ready
Document Support
Mailing Consent 
Terms Engagement